Get in touch today

    Arrow Black

    Wall Screen FG 35 is a louvre wall system that can be clicked directly onto the mullion. This results in quick and smooth assembly.

    There are three different louvre blades to choose from. In this way, the louvre wall can be adapted to the wishes and needs of any project. The system is eminently suitable for projects where the louvre wall acts primarily as screening.

    Wall Screening 35 Finish Facades Datasheet

    Dimensions and Mullions

    Type of mullion 40/21 (Double) 40/70 (Double) 40/100 (Double)
    Spacing of the louvre (pitch) 75mm - 112mm - 150mm 75mm - 112mm - 150mm 75mm - 112mm - 150mm
    Louvre depth 43mm 43mm 43mm
    Recess depth 57mm 107mm 137mm
    Maximum span between 2 mullions 2000m 2000m 2000m

    Ventilation Values

    Feature 75 STND 75 +OPT 112 STND 112 +OPT 150 STND 150 +OPT
    Visual Free Area 52% 52% 68% 68% 76% 76%
    Physical Free Area 29% 29% 27% 27% 35% 35%
    Ce 0,128 0,128 0,122 0,121 0,206 0,204
    Cd 0,162 0,161 0,174 0,175 0,224 0,222
    K - Factor Intake 61,04 61,04 67,19 68,30 23,56 24,03
    K - Factor Exhaust 38,10 38,58 33,03 32,65 19,93 20,29

    Water Resistance

    Air Velocity 75 STND 75 +OPT 112 STND 112 +OPT 150 STND 150 +OPT
    0 m/s A A B B C C
    0,5 m/s B B C B C C
    1 m/s B B C C D D
    1,5 m/s D D D D D D
    2 m/s D D D D D D
    2,5 m/s D D D D D D
    Arrow Black

    Featured Case Study

    (Heathrow) Premier Inn Reclad

    Premier Bg

    An ambition to deliver a transformational identity to the Premier Inn company, with the supply of.1.5Million reclad, 2,500sqm of 3mm solid Aluminium recess fix panels to replace current ACM panels.

    Arrow Black

    Our Specialist Cladding Systems